MP urges progress on A417 Air Balloon Roundabout missing link upgrade

30th November 2017

A417 Air Balloon Roundabout

Geoffrey Clifton-Brown calls on the Secretary of State for Transport for progress on building the A417 Air Balloon roundabout missing link upgrade as soon as possible.

14. What progress has been made on the A417 Air Balloon roundabout missing link upgrade. [902669]

My hon. Friend knows well the interest I have taken in this project. Highways England is currently conducting a final review of the route options for the A417 missing link. It is on track to launch a public consultation early in the new year.

My right hon. Friend knows that the south-west is a low-growth area. This is a highly important strategic national road scheme linking the south-west with the midlands and the Thames corridor. Does he agree that we need to get on and build this scheme as soon as possible?

It is not just about that; we also know that this is a highly dangerous piece of road, where, tragically, there has been a further accident with loss of life in the past few weeks. So it is not just about creating the right economic links; it is also about creating a safer road network. For both those reasons I have been very clear with Highways England that I want to get on with this project.

| Hansard

Cirencester Survey

Download Cirencester Survey

Latest Newsletter

On Friday I chaired my annual flood meetings in at the Cotswold District Council in Cirencester and the Moreton Area Centre in Moreton-in-Marsh.

21st November 2017

Surgery Dates

Call 020 7219 5043 or email cliftonbrowng@parliament.uk to discuss the matter you wish to raise and the possibility of a surgery appointment. Appointments are 10 minutes long. A concise synopsis submitted in writing beforehand will ensure a productive use of time.

Stow GP Public Meeting

Verbatim Minutes of the Stow-on-the-Wold Public Meeting to discuss the provision of a new GP surgery – 30 June 2017.

CLICK HERE TO DOWNLOAD (PDF: 107k)

View The Cotswolds in a larger map